Friday, July 30, 2010

Naylor & Breen Builders hires M. J. Hayward to perform the mechanical work for the new Jiffy Mart (aka Colonial Deli).


Building owner: Champlain Oil Company (Claremont, NH & Burlington, VT)
http://www.jiffymartstores.com/Locations/Lebanon_Jiffy_Mart

General contractor: Naylor & Breen Builders, Inc. (Brandon, VT) - Kim Levins & Robert Breen
http://www.naylorbreen.com/

Mechanical engineering: W. V. Engineering Associates, Inc. (Keene, NH)
http://www.wvengineering.com/index.html

Hanover Veterinary Clinic hires M. J. Hayward to install its new a/c systems.

Tired of installing window air conditioners practically every room, Hanover Veterinary Clinic of West Lebanon, NH hired M. J. Hayward to install its new 17 SEER R-410A refrigerant Carrier air conditioning split system with a modulating damper system to separate the building into two zones.

http://www.insiderpages.com/b/15247367804/scheidt-vicki-dvm-hanover-veterinary-clinic-west-lebanon

Hanover Outdoors (Hanover, NH) hires M. J. Hayward to upgrade its hvac equipment.


Increased efficiency was the name of the game while replacing Hanover Outdoors' hvac equipment. New condensing units, air handlers & their refrigerant piping to meet today's refrigerant standards were installed.

http://www.hanoveroutdoors.com/

Genesis Health Care Corporation hires M. J. Hayward to perform electrical work.


Genesis Health Care Corporation's Lebanon, NH facility hired M. J. Hayward to perform numerous lighting & receptacle changes.

http://www.genesishcc.com/index.cfm?facility_id=169&page_id=3

R. C. Brayshaw & Co., Inc. hires M. J. Hayward to perform hvac retrofit @ its new West Lebanon, NH facility.


Printing firm R. C. Brayshaw & Company, Inc. of both Warner, NH & West Lebanon, NH recently purchased Imperial Printing & its facility @ 11 Commerce Avenue in West Lebanon, NH & has hired M. J. Hayward to retrofit its hvac systems & ductwork to meet its needs.

http://www.rcbrayshaw.com/

http://www.facebook.com/RCBrayshawCo?ref=ts&v=wall

Ingram Construction hires M. J. Hayward to perform the mechanical retrofit for Ellis Block.


Building owner: Vermont Housing & Springfield (VT) Housing Authority
http://www.vsha.org/

General contractor: Ingram Construction Corp. (West Swanzey, NH) - Steve Ingram
http://www.ingram-construction.com/index.php

Architect: MaClay Architects (Waitsfield, VT)
http://www.maclayarchitects.com/current-projects/169-ellis-block-reconstruction

Mechanical engineering: John F. Penney Consulting Services, PC (Chester, VT)
http://jfpcs.com/

Trumbull-Nelson Construction Co., Inc. hires M. J. Hayward for Barre Tile's new Lebanon, NH facility.


Site: 187 Mechanic Street (Lebanon, NH)

Building owner: Barre Tile (Barre, VT & Lebanon, NH)
http://www.barretile.com/index.html

General contractor: Trumbull-Nelson Construction, Co., Inc. (Hanover, NH) - Jason Yehle
http://www.t-n.com/

Architect: Geoff Thornton (East Thetford, VT)
http://www.gthorntondesign.com/

Mechanical engineering: Dubois & King, Inc. (Randolph & Williston, VT & Bedford, NH)
http://www.dubois-king.com/

Trumbull-Nelson Const. Co., Inc. hires M. J. Hayward to perform the mechanical retrofit & installation for the Proctor Academy Slocumb Hall addition.


Building owner: Proctor Academy (Andover, NH)
http://www.proctoracademy.org/

General contractor: Trumbull-Nelson Construction Co., Inc. (Hanover, NH) - Todd Thompson
http://www.t-n.com/

Architect: Banwell Architects (Lebanon, NH) - Ingrid Moulton
http://www.google.com/imgres?imgurl=http://www.banwell-architects.com/images/proctor_slocum_hall.jpg&imgrefurl=http://www.banwell-architects.com/pages/ontheboards_proctor.html&usg=__OLnLvi03liDToHvjF0oV3EmSYhw=&h=324&w=585&sz=206&hl=en&start=1&sig2=J9ZeA8mHQXZ9c6RHV0t87Q&um=1&itbs=1&tbnid=rivG93kAsR6hwM:&tbnh=75&tbnw=135&prev=/images%3Fq%3Dslocumb%2Bhall%2Bproctor%2Bacademy%2Bandover%2Bnh%26um%3D1%26hl%3Den%26sa%3DN%26tbs%3Disch:1&ei=qCZTTJS3HoGB8gbP5IGUAw

Mechanical engineering: John F. Penney Consulting Services, PC (Chester, VT)
http://jfpcs.com/