Monday, March 30, 2009

MJH performing geothermal hvac installation @ the South Cove Activity Ctr in Eastman (Grantham, NH).




Photos from inside the new South Cove Activity Ctr. Top pic shows a ClimateMaster horizontal geothermal heat pump. Middle pic shows the early stages of a manifold system located in the main mechanical room. Bottom pic shows insulated water lines that originate from the geothermal wells, run beneath the cement slab & then to the equipment.


Monday, December 29, 2008

MJH signed on for Lebanon (NH) College project.


Lebanon College (http://www.lebanoncollege.edu/) has recently signed us up to perform the design & installation of a the hvac fit-up in the old Shoetorium building located next to the college's main building in Lebanon, NH.

Happy New Year!

Wishing you a safe & healthy 2009!

Monday, December 22, 2008

Merry Christmas!


From our family to yours....Merry Christmas!

Wednesday, December 17, 2008

Tuesday, December 16, 2008

Commercial space for lease.


MJ Hayward has 6+K sq' of office & warehouse space available for lease in Lebanon, NH w/ in the beautiful Centerra Park. It is w/ in close proximity to Dartmouth College & I-89. There is a drive-in warehouse bay, the office is air conditioned & the entire space is heated by floor radiant.


Please contact Mike Hayward, Jr. @ 603.298.6981 or mikejr@mjhayward.com.

Eastman Center temporary generator hook up.
















Even though the ice storm caused power outages in Grantham, NH, the Eastman Center had big goings on that couldn't be cancelled. Thanks to Carroll Concrete & United Construction, we temporarily hooked up this industrial CAT standby generator that powered the entire Center. John Chaloux, Justin Hayward & Kimberlee Hayward, all MJ Hayward employees, are included in the photos from this very cold Saturday afternoon.