Earlier this past winter we install an air conditioning system (Lennox) to condition the City of Lebanon's (NH) IT Room. The city soon experienced w/ the humid months that the space also needed to be dehumidified as it is located partially below grade & experiences high humidity even when the set temperature is reached. The city also wanted to ensure the space was supplied w/ sufficient humidity during the dry winter months.
These pics show the air handler (apologies for the ninety-degree turn of the pic), outdoor condensing unit & the pulling of wire to the electrical panels.
No comments:
Post a Comment